
The Municipality of Brighton is continuing to chip away at asphalt patch repair work.
In addition to the stretch along Elizabeth – between Prince Edward and Oliphant streets on Thursday – additional work is coming up in the Little Lake Road area.
Municipal staff say on Friday, Oct. 17 and Tuesday, Oct. 21, work will take place in the Little Lake Road area between the hours of 7 a.m. and 5 p.m.
The work will be taking place between Tee’s Lane and Hwy. 30. Traffic control will be onsite to help with the flow of vehicles, say staff.
(Written by: Sarah Hyatt)